回覆: 回覆: 雲端彩現點數的常見問題 | ||||||||||||||||||||||
標題: 回覆: 回覆: 雲端彩現點數的常見問題 作者 admin 於 2017-12-27 因為有客戶詢問雲端點數計價方法,查找到原廠有一個表單,整理供大家參考 |
服務名稱 | 計算方式 |
Rendering in A360 | Approximately 1 cloud credit per Megapixel (variable),每百萬像素大約1個雲信用(還有其他因素) |
Autodesk® Moldflow® | 20 for standard analysis,標準分析需要20點 |
Simulation Mechanical ** | 15 ,機械模擬需要15點 |
Autodesk CFD** | 10, 30 or 100 cloud credits based on complexity (cost will be displayed before solving),依複雜度需要10,30或100雲端點數 Prorated charge for cancelled jobs: 5 CC per hour of cloud solve time, accrued hourly; capped at job cost,如中途取消,將依比例收取已計算的部分費用。 |
Simulation RSA** | 5 ,需要5點 |
Profile Optimization for InfraWorks 360 | 100 per 5km of road,最佳化運算每5公里需要100點 |
Watershed Analysis for InfraWorks 360 | Free for a single point watershed; To analyze along a road: 50 CC per linear 5 km for road intersecting watersheds,流域分析依與道路相交長度計算 |
Structural Analysis for Revit | 2,結構分析(For Revit)需要2點 |
Character Generator | 5 per job,角色生成器需要5點 |
Lighting Analysis for Revit | Low resolution free for less than 25,000 square feet and approximately 1 cloud credit per additional 12,500 square feet.,低於25000平方英尺的低解析分析約1點,每增加12500平方英尺再加1點。 |